Sunday, January 20, 2008

PROJECT SITE PLAN SECTION - 1.

Built up area for Technical Textile Mill.

[1]Water tank - Ground level - Shape-Round - 20 mtr wide x 15 mtr high.

[2]Godown for storage of raw materials - 30 x 37 mtr which should be rodent and fire proof.

[3]Mixing.Opening and Cleaning Machinery - 20 x 37 mtr which should be fire proof and with industrial lighting system.

Under ground dust celler below 50 percent of[3]south to north.

[4]Carding Machinery department - 20 x 37 mtr separated by a wall with industrial lighting which is fire proof and with fire proof doors.

[5]Pre spinning department - 30 x 37 mtr separated by wall from[4]which will be fire proof with fire proof doors and having industrial lighting.

[6]Spinning department - 25 x 37 mtr separated by [5]with good industrial lighting arranged in such a way that no shadow falls on working part of the machines with fire proof construction arrangement and fire proof doors.

[1]to [6]to have rest rooms as per norms.

THIS AREA IS FOR OPENING AND SPINNING DAPARTMENTS ONLY.

Area required for humidification electric cables and distribution boards will be arranged in between the departments with - in the walls separating each department.Height of all buildings as per Industrial norms.Buildtech technology to be incorporated.